The Flood Control Unit performs the following tasks as needed:
-
Inspects and cleans 950 flap and sluice gates.
-
Seeds, fertilizes, and mulches 20 acres.
-
Hand cuts 50 acres of trees and brush from the floodway.
-
Repairs fencing on the project.
-
Completes floodway, roadway, and levee grading as required.
-
Inspects the project during high water to ensure proper operation.
-
Mows 8,948 acres.
-
Completes 400,000 cubic yards of erosion repairs.